干货,罗列了一些经常在与客户邮件往来、会议中被提及的缩写,后续不定期更新出来
|
No. |
名词 |
全称 |
中文说明 |
|
1 |
AVB |
Autoline Verification Build |
自动化线体验证 |
|
2 |
AVL |
Approved Vendor List |
认证供应商清单 |
|
3 |
BOC |
Breakdown of Cost |
成本分解 |
|
4 |
CAR |
Carrier Build |
导入阶段 |
|
5 |
DOE |
Design of Experiments |
实验设计 |
|
6 |
DT |
Down Time |
停机时间 |
|
7 |
DVT |
Design Verification Test |
设计验证测试阶段 |
|
8 |
ECN |
Engineering Change Notice |
工程变更通知 |
|
9 |
ESD |
Electro-Static Discharge |
静电放电 |
|
10 |
ETA |
Estimated Time of Arrival |
预计到达时间 |
|
11 |
ETC |
Estimated Time of Checkpoint |
确认时间点 |
|
12 |
ETD |
Estimated Time of Delivery |
预计发货时间 |
|
13 |
EVT |
Engineering Verification Test |
工程验证测试阶段 |
|
14 |
FACA |
Failure Analysis Correction Actions |
失效分析与纠正措施 |
|
15 |
FAT |
Fixture Acceptance Test |
载具验收测试 |
|
16 |
FAT |
factory acceptance Test |
工厂验收测试 |
|
17 |
FBO |
Fixture Buy-off |
载具认证 |
|
18 |
FMEA |
Failure Model Effectiveness Analysis |
失效模式分析 |
|
19 |
GR&R |
Gage Repeatability & Reproducibility |
量具的重复性与再现性 |
|
20 |
HAF |
Heat Activated Film |
热敏胶 |
|
21 |
LR |
Life and Robustness Test |
可靠性测试 |
|
22 |
IPQC |
In-Process Quality Control |
制程质量控制 |
|
23 |
IQC |
Incoming Quality Control |
进货质量控制 |
|
24 |
LBO |
Line Buy-off |
线体认证 |
|
25 |
MBO |
Machine Buy-off |
设备认证 |
|
26 |
MCO |
Mechanical Control Outline |
管控图档 |
|
27 |
MES |
Manufacturing Execution System |
制造执行系统 |
|
28 |
MIH |
Material In House |
材料到位 |
|
29 |
MP |
Mass Production |
量产 |
|
30 |
MSDS |
Material Safety Data Sheet |
化学品安全说明书 |
|
31 |
NPI |
New Product Introduction |
新品 |
|
32 |
ODM |
Original Design Manufacturer |
原始设备设计商 |
|
33 |
OEM |
Original Equipment Manufacturer |
原始设备制造商/代工 |
|
34 |
OEE |
Overall Equipment Effectiveness |
设备综合效率 |
|
35 |
OQC |
Outgoing Quality Control |
出货质量控制 |
|
36 |
ORT |
Ongoing Reliability Test |
产品可靠性测试 |
|
37 |
OVB |
Operation Verification Build |
运行验证 |
|
38 |
P1 |
Proto1 |
试样阶段1 |
|
39 |
P2 |
Proto2 |
试样阶段2 |
|
40 |
P3 |
Proto3 |
试样阶段3 |
|
41 |
PBU |
Process Build Uniform |
制程归一化流程 |
|
42 |
PMP |
Product Management Plan |
生产管制计划 |
|
43 |
PO |
Purchase Order |
采购订单 |
|
44 |
POC |
Proof of Concept |
概念验证阶段 |
|
45 |
PRQ |
Post Ramp Qualification |
量产后认证 |
|
46 |
PSA |
Pressure Sensitive Adhesive |
压敏胶 |
|
47 |
PVT |
Pilot-run Verification Test |
小批量过程验证测试阶段 |
|
48 |
RFQ |
Request For Quotations |
报价单 |
|
49 |
SAT |
Site Acceptance Test |
现场验收测试 |
|
50 |
SOP |
Standard Operation Procedure |
制造作业规范(标准指导书) |